     Kremikovtzi Corp. is one of the largest metallurgic plants on the Balkan Peninsula. In 2005 it became property of Global Steel Holdings Limited. Since then the management of the company have been applying a systematic approach for resolving the problems related to environment preservation by decreasing of natural reserves utilization, decreasing of detrimental emissions, through implementation of ecological clean technologies, implementation of the European standards for operating equipment and technologies.
     In the spirit of these principles, the ”Investors program for execution of Company activities in accordance with Normative regulations for environment” that is currently being executed and will be accomplished by 2012.
     The program includes activities about components “air” and “waters”, and factor “wastes” of a total cost of BGN 311 910 000.
     The Company has developed an investment program for technological innovation of production, predicting the implementation of new ecological technologies, according to the best international standards. The main items in the ecological program are supplying of electrical furnaces with sleeve filters, building of installation for biochemical treatment of the water containing phenol in Coke oven Plant, installation for dehydrating of middling slims from Blast Furnaces and SMS. The basic purpose is building of systems for continuous control of all devices. 20 electrical filters, 7 bag filters for the exit gasses from the technological lines. In 2003, a new electrical filter was put in operation, provided with an automatic monitoring system in the Sinter Plant. The modernized Blast Furnace - 1 is provided with a new filter. Bag filters for the Continuous Caster were installed in the period 2005-2006. As per the instructions of the Ministry of Environment and Water, “Kremikovtzi” AD is accomplishing own observation of air, water and wastes. This activity is performed directly by the “Research and control of environment” Department. The subsequent execution of the ecological activities joint with the technological innovation and modernization of the Company will decrease the existing risk for environment and health.
     • “Kremikovtzi” AD have to observe the Bulgarian legislation related to environment protection, in execution of requirements for prevention and control. The orders proceeding from the law include execution of requirements and regulations for issuing of permissions for building and operation of new installations as well as of the existing ones. (Directive of EU for full prevention and control of pollution – IPPC 96/91/??.
     • In order to achieve that target, the following devices must be improved in the frames of investors program of the Plant:
          - Sinter Plant – modernization of the sinter machines by structuring and putting in operation of 8 new electrical filters /4 process and 4 aspiration filters/;
          - Coke Ovens – capital innovation of coke chemical battery No4 within the period 2009-2010 by installing of a new coke chemical block and designing of projects for biological-and-chemical treatment of water for phenols and a system for indirect water cooling, as a condition for stopping the coke oven battery No3.
          - Blast Furnaces – capital repair with a reconstruction of Blast Furnace No3 during 2007, including implementation of installation for collection and purging of emissions from the casting area and the slag granulation area.
          - Steel Melting Shop – structuring of devices for purging of gas emissions from the existing converters and electrical arch furnace. All available converters will be repaired and two converters will be in operation at every moment.
          - Hot Strip Mill – reconstruction of the fuel system for the Reheating furnace No1.
          - Power Plant - reconstruction of the fuel system for steam generator and implementation of a system for automatic operation of the heating process.
     • Through the execution of these projects we will achieve:
          - Decreasing of dust separation from sinter plant in the frames of permitted limits.
          - Stopping of the detrimental emissions from the coke oven plant and achieving of gas and gas emission separation in the permitted limits; the water for phenols treatment will be processed and used in circulating cycle;
          - Reducing the detrimental emissions during the operation of Blast Furnaces No3 and No1 will stop, and dust separation from the area of Blast Furnace No3 to the permitted limits;
          - The detrimental emissions from Electrical Furnace No3 will be stopped and will ensure maintenance of dust separation in the frames of the permitted limits;
          - The maintenance of emissions of nitrogen oxide from Reheating furnaces in Hot Strip Mill will be provided in the frames of permitted limits;
          - The emissions of nitrogen oxide and sulfur dioxide from the steam generators in the power plant will be provided in the frames of the permitted limits.

 